For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Empty room sealed for asbestos abatement, its walls and windows covered in clear plastic sheeting and an air unit by the window
Asbestos testing and surveysPopcorn ceiling removalFloor tile and sheet vinyl removalAsbestos siding removalDuct and pipe insulation removalRemodel and demolition abatement

Asbestos removal services

Entry of a 1970s split-level with small taped sample spots on the ceiling, wall and floor and sealed sample bags on a stepUpper floor of a 1960s split-level with a painted popcorn ceiling, plastic over the floor and walls and the half-flight stair in view

Asbestos testing and surveys

Sampling comes before anyone scrapes, cuts or tears out a material. An inspector certified by MDH collects small pieces of each one, and an accredited lab reports how much asbestos it holds. State law treats a material as asbestos-containing once the result passes 1 percent.

Popcorn ceiling removal

Thinking of scraping a textured ceiling or swapping a light fixture? Have it tested first, because popcorn texture is on MDH’s list of home materials that can contain asbestos. A positive ceiling is worked on inside sealed plastic, kept damp and bagged as it falls.

Older kitchen floor of sheet vinyl lifted at one edge to show its gray felt backingSide wall of a house covered in gray cement siding shingles above a planted bed along the foundation

Floor tile and sheet vinyl removal

Vinyl tile, sheet vinyl and the glue under either can test positive. Since July 1, 2021, Minnesota counts flooring in homes of one to four units toward its asbestos work limits. Every layer gets sampled, and we lift only what the lab confirms.

Asbestos siding removal

Gray cement siding shingles and some roofing appear on MDH’s list of home materials that can hold asbestos. MDH says siding in good shape is best left alone, so we take off only the sections a re-side, new window or addition will disturb.

Basement mechanical room with heating pipes wrapped in white insulation and a doorway sealed with plastic sheetingA 1950s bathroom opened for a remodel, with the tub-surround wall cut out, floor tile lifted and plastic sheeting hung

Duct and pipe insulation removal

Heating ducts, pipes and furnace connections in an older house may be wrapped in insulation that holds asbestos. We wet the wrap, strip it into labeled bags and leave bare metal for your HVAC installer or plumber.

Remodel and demolition abatement

Opening a wall for a bigger kitchen in a 1970s two-story? The plaster, tape mud and window putty get sampled first. Under state rules, confirmed asbestos leaves the building before renovation or demolition, houses included, and we clear it before your builder arrives.

Asbestos testing and removal costs

More than 2 in every 10 Maple Grove homes were built before 1980, so asbestos still turns up in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Maple Grove, Osseo and Corcoran. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing a few materials, up to about 4 samples$300 – $600+
  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Asbestos survey before tearing down a house$800 – $2,000+
  • Survey of a small commercial or apartment building$1,500 – $4,000+
What is included

An MDH-certified inspector takes samples wherever your work will cut, sand or pull, or through the whole building before it comes down. Each sample is read by an accredited lab, and your written report shows where it was taken and what it held.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room ceiling, about 150 to 250 sq ft$1,700 – $4,300+
  • Several rooms or one floor, about 600 to 1,000 sq ft$5,000 – $13,500+
  • Whole house, about 1,500 to 2,000 sq ft of ceiling$9,500 – $24,000+
What is included

A sample from each textured ceiling, the MDH notice, furniture out and the room wrapped in plastic under negative air, the texture misted and scraped into sealed bags, air samples and the haul. New paint or skim coat is extra.

Get a free quoteSee an example project

Floor tile and sheet vinyl removal

  • One bathroom or laundry floor, about 50 to 100 sq ft$1,150 – $2,800+
  • One kitchen or large room, about 150 to 300 sq ft$1,700 – $4,800+
  • Several rooms or a basement, about 500 to 1,000 sq ft$3,800 – $11,500+
What is included

Each layer sampled on its own, from the top floor down to the adhesive, the MDH notice for licensed work, the area closed off, the flooring lifted wet down to the subfloor or slab, labeled bags and disposal. The replacement floor is extra.

Get a free quoteSee an example project

Asbestos siding removal

  • Siding on one wall, garage or shed, about 200 to 400 sq ft$2,400 – $6,000+
  • Siding on a one-story house, about 1,200 to 1,800 sq ft of wall$9,500 – $24,000+
  • Siding on a two-story house, about 2,000 to 3,000 sq ft of wall$15,000 – $38,000+
What is included

Plastic on the ground along each wall, shingles misted and pried off whole by hand, wrapped and labeled, the haul with its manifest and a final pick of the yard. New siding is extra. Roofing is priced after we look at the roof.

Get a free quoteSee an example project

Duct and pipe insulation removal

  • Pipe insulation in a basement, about 50 to 150 ft of pipe$1,400 – $4,300+
  • Duct wrap and tape in one basement or crawl space$1,400 – $4,300+
  • Old boiler or octopus furnace with its insulation and nearby pipe$4,300 – $11,500+
What is included

The MDH notice five days ahead, the basement work area sealed under negative air, tape and wrap kept wet and cut off in short lengths, leak-tight labeled bags, air samples before the plastic comes down, and disposal with its manifest. New ductwork or insulation is extra.

Get a free quoteSee an example project

Attic vermiculite removal

  • Attic vermiculite or loose-fill, about 800 to 1,500 sq ft of attic$7,500 – $19,000+
What is included

The attic hatch and the rooms below sealed, negative air in the attic, the loose fill bagged and labeled, the joists vacuumed, air samples and the haul. New insulation is extra.

Get a free quote

Remodel and demolition abatement

  • Abatement for one kitchen or bathroom remodel$1,900 – $5,500+
  • Abatement of a whole house before tear-down$9,500 – $28,500+
What is included

Every positive material in your survey taken out of the remodel area or the whole house, the state notice and fee, disposal with manifests, and the paperwork a demolition asks for. The survey is a separate line.

Get a free quoteSee an example project

Plaster, drywall and joint compound removal

  • One wall or a small patch, up to about 100 sq ft of wall$1,150 – $2,800+
  • One room of walls, about 300 to 500 sq ft$2,600 – $6,000+
  • Several rooms or one floor of walls$7,500 – $20,000+
What is included

Wall or ceiling sections that test positive, cut out wet behind plastic, bagged and hauled, with air samples before the room is used again. Framing and new drywall are extra.

Get a free quote

Apartment and commercial buildings

  • Small office, shop or apartment unit area, about 500 to 1,000 sq ft$4,800 – $14,000+
  • Larger floor or building section, about 2,500 sq ft$11,500 – $33,000+
What is included

For apartment buildings of five or more units, shops and offices: a look at the survey, containment, removal, air monitoring, the MDH and MPCA notices and disposal. Bigger buildings get a price after a walk-through.

Get a free quoteSee an example project

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Sampling and site visit

We come out to see the rooms your project touches, and an MDH-certified inspector takes samples there. The quote is written from the lab report, so it covers only what tested positive.

02

State notice and containment

MDH must receive our notice at least five calendar days before removal begins, and filing it is the licensed contractor’s job, so we handle it. Work day starts with plastic walls and a HEPA negative air machine around the area.

03

Removal, clearance and disposal

Everything we take off is kept damp and goes into sealed, labeled bags. The plastic stays up until clearance air samples pass, and then the waste leaves with a manifest for the landfill.

Maple Grove homes and asbestos

Just over half of Maple Grove’s homes went up in 1990 or later, and the median home dates from 1991. About 1 in 4 is older than 1980, though, and the 1970s alone supplied nearly 1 in 5 of the homes standing today. Textured ceilings, vinyl floors, wrapped ducts and cement siding from that era are all worth a sample before work starts.

Building here peaked in the 1980s, which supplied more than 1 in 5 of today’s homes. MDH says asbestos roofing and siding faded fast after the early 1980s. For a house from those years, that is a reason to test rather than to guess either way.

Maple Grove permits and Hennepin County inspections

The city’s licenses and permits page points building applicants to an online permit portal and does not mention asbestos. MDH notes that cities may require a demolition permit of their own, so confirm what Maple Grove needs before you pick a demolition date.

Hennepin County inspects houses and commercial buildings here before demolition. Its Ordinance 7 says asbestos comes out before a building is demolished or renovated, and the owner or contractor must hold the paper trail. That means the survey and its report plus the receipts for abatement and the manifests for disposal, and we give you every page.

Hennepin County drop-off sites don’t accept asbestos, so the waste from a job goes to a landfill that does, under a manifest.

Serving Maple Grove, Osseo and Corcoran

We also serve Osseo and Corcoran. Call us for confirmation if your address is outside the area.

Frequently asked questions

Does a house built after 1988 need testing?

Maybe not. MDH says a letter from the architect or contractor can stand in for an inspection when it confirms that no asbestos went into a building finished after October 1988. Maple Grove’s median home was built in 1991, so check your year before you book.

Can I take asbestos out of my house myself?

Yes, if it is a single-family house and you live in it. MDH still strongly recommends a licensed contractor, and we are glad to price the job so you can weigh both choices.

How much asbestos counts as regulated work?

Pipe is measured by length and everything else by area. In a house or a building with four units or fewer, friable material on a pipe becomes licensed work at more than 10 linear feet, and on a ceiling, wall, floor or any other surface at more than 6 square feet. A cubic foot comes into play only where neither of those can be measured, and the line sits at more than 1 cubic foot. Buildings of five or more units use different figures. Smaller amounts fall outside the rules, yet MDH cautions that unregulated does not mean safe.

What goes into the price?

A bid from us lists labor, air monitoring and disposal, as MDH expects, then adds the state permit fee. That fee is $35 for a small home job and 3 percent of the cost of the asbestos work for larger ones. What else you pay depends on which material is involved, how much of it there is and how long the crew is on site. We give you a figure once we have walked the space and read the lab results.

What if suspect material turns up partway through a project?

Leave the material alone and call us before anything else is disturbed. A find partway through a renovation doesn’t count as an MDH emergency, so removal waits for the usual advance notice.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (763) 496-5017

Call (763) 496-5017